Planning Applications
Read Grundon's Summary How to Object
Grundon state that the application is for:
-
extraction of approximately 24,000 cubic metres of sand and gravel;
-
extraction of approximately 1,350,000 cubic metres of clay, of which approximately 432,000 cubic metres will be exported, with the remainder being used on site mainly for engineering purposes;
-
operation of plant to process sand and gravel for restoration of land to the approved profile, which will require the continued importation of approximately 2,945,000 cubic metres non-hazardous and 1,287,000 cubic metres hazardous wastes;
-
operation of the waste treatment plant (used to treat incoming waste, including air pollution control residues, prior to landfilling);
-
use of the landfill gas control system and associated landfill gas engines;
-
use of site offices and mess facilities;
-
use of weighbridges at both site entrances, and
-
use of wheel wash facilities at both site entrances.
and
-
The scheme includes the retention of the MRF facility that also includes vehicle servicing facilities, offices and mess facilities. The proposed MRF has a throughput of up to 50,000 tonnes per year.
-
The site will also continue to operate a clinical waste transfer service, handling approximately 500 tonnes. The clinical waste is stored in sealed articulated trailers for transport off site for treatment.
View Full Application [ Back ] |